Spanish Mountain Gold Drilling Extends the Orca Fault Target Trend to a Strike Length Over 500 Metres Intersecting Numerous High-Grade Results Including 40.00 Metres Grading 0.98 g/t Gold
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20251222973672/en/
Figure 1: Drill Long Section Through Orca Fault Area (looking northeast); section line A-A’ (see Figure 4)
The company has completed approximately 8,220 m of drilling to date of the 9,000 to 10,000 metres (“m”) of exploration drilling planned under the 2025 Fall Drill Program. Assays and geochemistry are pending receipt from the laboratory and or reporting from twelve (12) additional drill holes completed on the newly defined Orca Fault area.
Highlights:
- 25-DH-1307 intersected from 30.00 to 82.00 m, 52.00 m of 0.50 g/t gold including two high-grade intervals of 20.00 m of 1.07 g/t gold and 11.25 m of 1.28 g/t gold with a subset of 6.00 m of 2.18 g/t gold;
- 25-DH-1309 intersected from 77.24 m to 88.75 m, 11.51 m of 0.99 g/t gold including 5.71 m of 1.59 g/t gold;
- 25-DH-1310 intersected from 57.20 to 83.50 m, 26.30 m of 0.76 g/t gold including 3.00 m of 2.55 g/t gold;
- 25-DH-1311 intersected from 57.00 to 97.00 m, 40.00 m of 0.98 g/t gold including 10.00 m of 1.37 g/t gold with a subset of 3.00 m of 3.72 g/t gold;
- 25-DH-1312 intersected from 22.00 to 86.50 m, 64.50 m of 0.53 g/t gold including 13.20 m of 1.36 g/t gold; and
- 25-DH-1313 intersected from 42.60 to 116.95 m, 74.35 m of 0.66 g/t gold including 23.72 m of 1.25 g/t gold with a subset of 2.04 m of 8.61 g/t gold;
Key Findings:
- Current exploration drilling assay results continues to intersect significant higher-grade mineralization over approximately 500 m in strike length in the newly defined Orca Fault target (Figure 1, 2, and 3) and the continuity can now be traced across multiple parallel, adjacent drill sections.
Main Deposit – Orca Fault area, Southeastern Extension
In the
Six additional drill holes were collared and successfully completed (see Figure 4) in this southeastern extension area, 25-DH-1307 (Figure 1 and Table 1), 25-DH-1309 (Figure 1 and Table 2), 25-DH-1310 (Figure 2 and Table 3), 25-DH-1311 (Figure 3 and Table 4), 25-DH-1312 (Figure 2 and Table 5), and 25-DH-1313 (Figure 2 and Table 6). These drill holes, like 25-DH-1304 (see
All results to date continue to reinforce that tighter exploration drill spacing at the preferred azimuth of 120-degrees is unlocking additional mineral potential in the Main deposit. These exploration drill holes are presented on a drill section (Figure 1, Figure 2, and Figure 3) that shows the alignment of the higher-grade mineralization to the new Orca Fault target.
Table 1: Assay Results for 25-DH-1307
|
Drill hole |
From (m) |
To (m) |
Width (m) |
Gold (g/t) |
Apparent True Thickness |
|
25-DH-1307 |
30.00 |
82.00 |
52.00 |
0.50 |
Note 3) |
|
including |
58.00 |
82.00 |
24.00 |
0.93 |
Note 3) |
|
including |
62.00 |
82.00 |
20.00 |
1.07 |
Note 3) |
|
including |
62.00 |
77.25 |
15.25 |
1.14 |
Note 3) |
|
including |
62.00 |
68.00 |
6.00 |
2.18 |
Note 3) |
|
including |
66.00 |
77.25 |
11.25 |
1.28 |
Note 3) |
|
|
97.00 |
102.45 |
5.45 |
0.39 |
Note 3) |
|
|
127.80 |
132.00 |
4.20 |
0.61 |
Note 3) |
Table 2: Assay Results for 25-DH-1309
|
Drill hole |
From (m) |
To (m) |
Width (m) |
Gold (g/t) |
Apparent True Thickness |
|
25-DH-1309 |
28.82 |
88.75 |
59.93 |
0.47 |
Note 3) |
|
including |
49.16 |
53.10 |
3.94 |
0.77 |
Note 3) |
|
including |
64.00 |
70.00 |
6.00 |
0.92 |
Note 3) |
|
including |
77.24 |
88.75 |
11.51 |
0.99 |
Note 3) |
|
including |
77.24 |
82.95 |
5.71 |
1.59 |
Note 3) |
Table 3: Assay Results for 25-DH-1310
|
Drill hole |
From (m) |
To (m) |
Width (m) |
Gold (g/t) |
Apparent True Thickness |
|
25-DH-1310 |
19.00 |
83.50 |
64.50 |
0.41 |
Note 3) |
|
including |
57.20 |
83.50 |
26.30 |
0.76 |
Note 3) |
|
including |
57.20 |
73.00 |
15.80 |
0.89 |
Note 3) |
|
including |
70.00 |
73.00 |
3.00 |
2.55 |
Note 3) |
Table 4: Assay Results for 25-DH-1311
|
Drill hole |
From (m) |
To (m) |
Width (m) |
Gold (g/t) |
Apparent True Thickness |
|
25-DH-1311 |
11.20 |
18.00 |
6.80 |
0.48 |
Note 3) |
|
57.00 |
97.00 |
40.00 |
0.98 |
Note 3) |
|
|
including |
58.50 |
95.00 |
36.50 |
1.05 |
Note 3) |
|
including |
61.00 |
71.00 |
10.00 |
1.37 |
Note 3) |
|
including |
58.50 |
61.50 |
3.00 |
3.72 |
Note 3) |
|
including |
81.00 |
95.00 |
14.00 |
1.07 |
Note 3) |
|
including |
81.00 |
85.00 |
4.00 |
2.27 |
Note 3) |
Table 5: Assay Results for 25-DH-1312
|
Drill hole |
From (m) |
To (m) |
Width (m) |
Gold (g/t) |
Apparent True Thickness |
|
25-DH-1312 |
22.00 |
86.50 |
64.50 |
0.53 |
Note 3) |
|
including |
69.00 |
82.20 |
13.20 |
1.36 |
Note 3) |
Table 6: Assay Results for 25-DH-1313
|
Drill hole |
From (m) |
To (m) |
Width (m) |
Gold (g/t) |
Apparent True Thickness |
|
25-DH-1313 |
42.60 |
116.95 |
74.35 |
0.66 |
Note 3) |
|
including |
42.60 |
97.21 |
54.61 |
0.69 |
Note 3) |
|
including |
67.00 |
90.72 |
23.72 |
1.25 |
Note 3) |
|
including |
88.68 |
90.72 |
2.04 |
8.61 |
Note 3) |
|
|
201.00 |
204.00 |
3.00 |
0.54 |
Note 3) |
|
Notes for Table 1 to Table 6: |
||
|
1) |
|
Reported intersections are calculated using a 0.15 g/t Au cut-off grade. |
|
2) |
|
The complete assay table is available on the Company’s website |
|
3) |
|
True thickness of mineralization is unknown as the project is still at the exploration stage |
The integration of assay results from these six exploration drill holes into the southeastern extension of the Orca Fault target strengthens the overall continuity for the new Orca Fault target and the association of higher-grade mineralization over a strike length of 500 m, northwest to southeast (see Figure 1 and Figure 2) now spanning multiple parallel, adjacent drill sections over 80 m, northeast to southwest.
The current interpretation is that there is strong continuity between these section lines linking geology, structure and the higher-grade mineralization. The mineralization in these drill holes occurs in faults and quartz-dominated veins that appear to extend for more than 25 m beyond each drill hole. Two dominant sets of veins were identified, high-angle and low-angle. The lower-angle veins (~45 degrees) occur in proximity to the Orca Fault (see
Other – A12 Exploration Target (Mill and Process Plant Location)
Five drill holes were successfully completed on the A12 target that overlapped the Mill and Process Plant location in the recent Preliminary Economic Assessment (see
Of the five drill holes, only drill hole 25-DH-1301 had an intercept that will require additional study and potentially more drilling to the southwest to evaluate if there is any additional mineral potential possible for the A12 target. The other four drill holes did not have any significant results and closed off the target to both the northwest and southeast. Drill hole 25-DH-1301 intersected 42.12 m grading 0.40 g/t gold with a higher-grade subset of 18.12 m grading 0.71 g/t gold.
Figure 4 illustrates the locations for eleven drill hole results outlined in this news release and the drill holes currently in the assay lab, or in process of being drilled. Drill collar location coordinates are summarized for the 2025 Fall Drill Program in Table 4 at the end of this news release.
Abbreviations: metres = m, grams per tonne = g/t, gold = Au, mineral resource estimate = MRE,
Drill Core Processing, Data Verification and Quality Assurance – Quality Control Program (QAQC)
Once received from the drill and processed, all drill core samples were sawn in half, labeled, and bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags were applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals, including blanks and reference materials, for all sample shipments to monitor laboratory performance. Standards and blanks account for a minimum of 20% of the samples in addition to the laboratory’s internal quality assurance programs. The QAQC program was overseen by the Company’s Qualified Person,
The data verification process involved a multi-step approach to ensure accuracy and integrity. This included a detailed quality control (QC) analysis of the data, which was performed using both internal and external platforms, such as the MxDeposit™ software. These QC checks involved the analysis of certified reference materials (CRMs), blanks, and duplicates to confirm the reliability of the assay results. In addition, a field inspection of the specific drill intervals mentioned in this release has been conducted to directly observe the geological features and verified the nature of the results presented.
Drill core samples were submitted to MSALABS’s analytical facility in
PhotonAssayTM
The PhotonAssayTM method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssayTM instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing ores and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method CPA-Au1).
The PhotonAssayTM instrument bombards 400- to 600-gram samples contained in sealed containers with gamma rays. These containers remain sealed throughout the process, preserving the sample for potential further testing. The analysis is performed robotically, with results that integrate into existing laboratory management systems. Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM). Both the sample and reference disc undergo gamma ray exposure, with signals detected and analyzed to ensure accurate and reliable results. The method offers a gold detection range from 0.015 parts per million (ppm - lower limit) to 10,000 ppm (upper limit). Quality control includes the use of reference materials and blanks, with all results reviewed by a competent person before reporting.
Multi-Elemental Analysis
For the 2025 drilling campaign
Key Process Steps:
Sample Preparation: Samples are dried and ground to a specific criterion (85% passing 75 microns (μm) for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram sample is required. Digestion: Samples undergo sequential digestion with nitric, perchloric, hydrofluoric, and hydrochloric acids, followed by dilution with deionized water.
Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification. Quality Control: The process includes reference materials, blanks, and duplicates, with corrections for spectral interferences and thorough review before final reporting.
Qualified Person
About
On Behalf of the Board,
“Peter Mah”
President, Chief Executive Officer and Director
Neither the
FORWARD-LOOKING INFORMATION:
Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and include but are not limited to information with respect to, the potential for adding more higher-grade gold mineralization within the pit or below current pit design; and the timing and size (m) of the 2025 Fall Drill Program, and the results thereof. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information.
Table 4: Drill Collar Information for Drill Holes
|
Hole ID |
EAST |
NORTH |
ELEV |
AZIMUTH |
DIP |
DEPTH |
COMMENT |
|
25-DH-1325 |
604385 |
5827966 |
1103 |
120 |
-60 |
N/A |
Successfully completed per design |
|
25-DH-1324 |
604343 |
5828053 |
1080 |
120 |
-60 |
N/A |
Successfully completed per design |
|
25-DH-1323 |
604286 |
5828046 |
1097 |
120 |
-60 |
338 |
Successfully completed per design |
|
25-DH-1322 |
604279 |
5827995 |
1106 |
120 |
-60 |
231 |
Successfully completed per design |
|
25-DH-1321 |
604350 |
5828016 |
1099 |
120 |
-60 |
348 |
Successfully completed per design |
|
25-DH-1320 |
604561 |
5827809 |
1126 |
120 |
-60 |
57 |
Ended early due to major fault zone |
|
25-DH-1319 |
604404 |
5827992 |
1095 |
120 |
-70 |
198 |
Successfully completed per design |
|
25-DH-1318 |
604445 |
5828098 |
1055 |
120 |
-60 |
243 |
Successfully completed per design |
|
25-DH-1317 |
604186 |
5828166 |
1076 |
120 |
-60 |
282 |
Successfully completed per design |
|
25-DH-1316 |
604514 |
5828073 |
1050 |
120 |
-60 |
177 |
Successfully completed per design |
|
25-DH-1315 |
604231 |
5828163 |
1075 |
120 |
-60 |
282 |
Successfully completed per design |
|
25-DH-1314 |
604160 |
5828218 |
1056 |
120 |
-70 |
270 |
Successfully completed per design |
|
25-DH-1313 |
604566 |
5827908 |
1100 |
120 |
-60 |
204 |
Successfully completed per design |
|
25-DH-1312 |
604538 |
5827921 |
1095 |
120 |
-60 |
205 |
Successfully completed per design |
|
25-DH-1311 |
604590 |
5827935 |
1084 |
120 |
-60 |
330 |
Successfully completed per design |
|
25-DH-1310 |
604592 |
5827961 |
1091 |
120 |
-60 |
211 |
Successfully completed per design |
|
25-DH-1309 |
604592 |
5827958 |
1071 |
120 |
-60 |
237 |
Successfully completed per design |
|
25-DH-1308 |
603280 |
5829250 |
966 |
120 |
-60 |
150 |
Successfully completed per design |
|
25-DH-1307 |
604565 |
5827974 |
1068 |
120 |
-60 |
200 |
Successfully completed per design |
|
25-DH-1306 |
603451 |
5829400 |
927 |
120 |
-60 |
123 |
Successfully completed per design |
|
25-DH-1305 |
603657 |
5829226 |
919 |
120 |
-60 |
126 |
Successfully completed per design |
|
25-DH-1304 |
604536 |
5827986 |
1067 |
120 |
-60 |
225 |
Successfully completed per design |
|
25-DH-1303 |
603960 |
5828754 |
943 |
100 |
-55 |
156 |
Successfully completed per design |
|
25-DH-1302 |
604194 |
5828180 |
1066 |
120 |
-63 |
282 |
Successfully completed per design |
|
25-DH-1301 |
603708 |
5829029 |
929 |
150 |
-55 |
188 |
Successfully completed per design |
|
25-DH-1300 |
604388 |
5828063 |
1085 |
120 |
-60 |
274 |
Successfully completed per design |
|
25-DH-1299 |
604369 |
5828043 |
1093 |
120 |
-60 |
336 |
Successfully completed per design |
|
25-DH-1298 |
604402 |
5828088 |
1074 |
120 |
-59 |
334 |
Successfully completed per design |
|
25-DH-1297 |
604354 |
5828069 |
1084 |
120 |
-59 |
342 |
Successfully completed per design |
|
25-DH-1296 |
604484 |
5828054 |
1061 |
120 |
-50 |
180 |
Successfully completed per design |
|
25-DH-1295 |
604484 |
5828054 |
1061 |
120 |
-60 |
33 |
Ended early due to drill trace spacing |
|
25-DH-1294 |
604345 |
5828120 |
1075 |
120 |
-58 |
351 |
Successfully completed per design |
|
25-DH-1293 |
604284 |
5828149 |
1076 |
120 |
-60 |
453 |
Successfully completed per design |
|
25-DH-1292 |
604223 |
5828189 |
1068 |
120 |
-62 |
270 |
Successfully completed per design |
View source version on businesswire.com: https://www.businesswire.com/news/home/20251222973672/en/
For more information, contact:
(604) 601-3651
info@spanishmountaingold.com
Source: