First Mining Identifies Eastern Extension Resource Growth Opportunity at the Springpole Gold Project
- Drill hole SP24-007 returns 0.83 g/t Au and 8.02 g/t Ag over 52.50 m and 0.61 g/t Au and 4.66 g/t Ag over 46.50 m
- 0.83 g/t Au and 8.02 g/t Ag over 52.50 m
- 0.61 g/t Au and 4.66 g/t Ag over 46.50 m
- 6.46 g/t Au and 34.87 g/t Ag over 1.10 m
The East Extension drill program demonstrates the potential for significant resource growth opportunities near the current proposed eastern pit wall at the
"These drilling results are very encouraging for our
The Phase 1 drill program at the Springpole East Extension target commenced in
The Eastern Extension target is located at the southeastern boundary of the current mineral resource and proposed pit wall design. A plan map of the Eastern Extension area and initial drill hole is presented in Figure 1, and corresponding assay highlights are presented in Table 1, with full assay results listed in Table 2 and drill hole locations in Table 3.
Table 1: Significant Drill Intercepts, 2024 Phase 1 Drill Program – Eastern Extension Target,
Hole ID |
|
From (m) |
To (m) |
Length (m) |
Grade ( Au g/t) |
Grade (Ag g/t) |
Target |
SP24-007 |
|
50.00 |
51.10 |
1.10 |
6.46 |
34.87 |
East Extension |
SP24-007 |
inc. |
50.60 |
51.10 |
0.50 |
13.70 |
73.10 |
|
SP24-007 |
|
73.00 |
119.50 |
46.50 |
0.61 |
4.66 |
|
SP24-007 |
|
302.50 |
355.00 |
52.50 |
0.83 |
8.02 |
|
SP24-007 |
inc. |
320.35 |
331.70 |
11.35 |
1.03 |
13.20 |
|
SP24-007 |
and inc. |
335.30 |
340.80 |
5.50 |
2.06 |
15.74 |
|
*Reported intervals are drilled core lengths (true widths are estimated at 75-85% of the core length interval, assay values are uncut) |
Additional Details on the Springpole East Extension Drilling Program
The Eastern Extension drilling is focused on a 150 m strike area along the southeastern edge of the current mineral resource (Figure 1). In 2023, First Mining identified the Eastern Extension target through advanced 3D target modelling, which highlighted a theorized easterly curve to the southern end of the main
Mineralization in SP24-007 is hosted within silicified and sericitized-altered intermediate volcanic/breccia units, and medium-grained trachyte. Mineralization consists mainly of 2-5% fine-grained, disseminated and fracture-controlled pyrite throughout the host units. Minor amounts of sphalerite, galena, chalcopyrite and tellurides were observed, mainly within quartz and quartz carbonate veining that comprises between 1-5% of the core. Higher-grade intervals (> 2 g/t Au) are more associated with mineralized brecciated quartz carbonate veining, and/or up to 10% fine-grained disseminated pyrite.
The 2024 drilling campaign further defined and tested the updated 3D targeting model within the Eastern Extension area for immediate resource growth potential. The new target area remains open along strike towards the south and southeast of the main
The main objectives of the 2024 exploration programs at the
Regional field work programs at First Mining's surrounding
Table 2: 2024 Phase 1 Drill Program, Eastern Extension Springpole Project - Significant Assays
Hole ID |
|
From (m) |
To (m) |
Length (m) |
Grade ( Au g/t) |
Grade (Ag g/t) |
Target |
SP24-007 |
|
50.0 |
51.1 |
1.1 |
6.46 |
34.87 |
East Extension |
SP24-007 |
inc. |
50.6 |
51.1 |
0.5 |
13.70 |
73.10 |
|
SP24-007 |
|
53.1 |
56.6 |
3.5 |
0.65 |
5.86 |
|
SP24-007 |
|
66.2 |
71.0 |
4.8 |
0.73 |
7.46 |
|
SP24-007 |
|
73.0 |
119.5 |
46.5 |
0.61 |
4.66 |
|
SP24-007 |
|
125.0 |
139.7 |
14.7 |
0.65 |
1.71 |
|
SP24-007 |
inc. |
128.0 |
129.0 |
1.0 |
3.20 |
0.80 |
|
SP24-007 |
|
148.9 |
149.9 |
1.0 |
0.48 |
0.54 |
|
SP24-007 |
|
152.9 |
162.5 |
9.6 |
0.40 |
1.99 |
|
SP24-007 |
|
166.1 |
175.1 |
9.0 |
0.37 |
5.36 |
|
SP24-007 |
|
179.0 |
187.0 |
8.0 |
0.47 |
4.68 |
|
SP24-007 |
|
200.0 |
203.0 |
3.0 |
0.31 |
3.61 |
|
SP24-007 |
|
213.0 |
224.0 |
11.0 |
0.49 |
7.64 |
|
SP24-007 |
|
237.0 |
250.0 |
13.0 |
0.56 |
5.04 |
|
SP24-007 |
|
254.0 |
262.0 |
8.0 |
0.41 |
3.64 |
|
SP24-007 |
|
264.0 |
265.0 |
1.0 |
0.46 |
4.45 |
|
SP24-007 |
|
270.5 |
272.5 |
2.0 |
0.45 |
3.14 |
|
SP24-007 |
|
287.35 |
291.0 |
3.65 |
0.47 |
10.39 |
|
SP24-007 |
|
302.5 |
355.0 |
52.5 |
0.83 |
8.02 |
|
SP24-007 |
inc. |
320.35 |
331.7 |
11.35 |
1.03 |
13.20 |
|
SP24-007 |
and inc. |
335.3 |
340.8 |
5.5 |
2.06 |
15.74 |
|
SP24-007 |
|
359.6 |
364.6 |
5.0 |
0.38 |
8.21 |
|
SP24-007 |
|
371.3 |
372.8 |
1.5 |
0.84 |
14.52 |
|
SP24-007 |
|
378.8 |
380.8 |
2.0 |
0.54 |
6.38 |
|
SP24-007 |
|
404.5 |
405.0 |
0.5 |
0.42 |
4.49 |
|
*Reported intervals are drilled core lengths (true widths are estimated at 75-85% of the core length interval, assay values are uncut) |
Table 3: Phase 1 Drill Hole Locations, Springpole East Extension Target
Hole ID |
Azimuth (°) |
Dip (°) |
Length (m) |
Easting |
Northing |
SP24-007 |
220 |
-70 |
449 |
549910 |
5693618 |
|
Note: Collar coordinates in UTM NAD 83 z15 |
All sampling completed by First Mining within its exploration programs is subject to a Company standard of internal quality control and quality assurance (QA/QC) programs which include the insertion of certified reference materials, blank materials and a level of duplicate analysis. Core samples from the 2024 drilling program at the
Qualified Person
About First Mining Gold Corp.
First Mining is a gold developer advancing two of the largest gold projects in
First Mining was established in 2015 by Mr.
ON BEHALF OF FIRST MINING GOLD CORP.
Chief Executive Officer and Director
Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and
Forward-looking statements in this news release relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events. All forward-looking statements are based on First Mining's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Such factors include, without limitation the Company's business, operations and financial condition potentially being materially adversely affected by the outbreak of epidemics, pandemics or other health crises, such as COVID-19, and by reactions by government and private actors to such outbreaks; risks to employee health and safety as a result of the outbreak of epidemics, pandemics or other health crises, such as COVID-19, that may result in a slowdown or temporary suspension of operations at some or all of the Company's mineral properties as well as its head office; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the
First Mining cautions that the foregoing list of factors that may affect future results is not exhaustive. When relying on our forward-looking statements to make decisions with respect to First Mining, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. First Mining does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by the Company or on our behalf, except as required by law.
Cautionary Note to
The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the
Technical disclosure contained in this news release has not been prepared in accordance with the requirements of
NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer's material mineral projects.
View original content to download multimedia:https://www.prnewswire.com/news-releases/first-mining-identifies-eastern-extension-resource-growth-opportunity-at-the-springpole-gold-project-302309264.html
SOURCE