FORTUNE BAY ANNOUNCES EXPLORATION TARGETS AT GOLDFIELDS AND COMMENCES DRILLING
Exploration Program Targets Near-Mine Ounce Growth
The targets include opportunities for resource expansion at the Box and
An initial 17 exploration holes (3,250 metres) are planned with provision to expand the program in a results-driven manner. The exploration drilling will be carried out in conjunction with development-related drilling, supporting advancement of Goldfields to Pre-Feasibility Study, as described in the Company's recent News Release.
Box Deposit – High-Grades Open at Depth
The Box deposit is wide open at depth. The Company's 2021 drilling confirmed high-grades extending up to 240 m beyond the extents of the current open-pit constrained Mineral Resource Estimate ("MRE") (Figure 2), including:
- 13.22 g/t Au over 8.0 m from 426.0 to 434.0 m (drill hole B21-340)
- 8.74 g/t Au over 5.0 m from 575.0 to 580.0 m (drill hole B21-339)
- 8.00 g/t Au over 12.0 m from 509.0 to 521.0 m (drill hole B21-336)
- 8.00 g/t Au over 4.0 m from 375.0 to 379.0 m (drill hole B21-334)
Four initial drill holes (2,000 m) are planned to test and infill large gaps (up to 170 m) in the existing drill hole coverage outside of the MRE to test for extensions to high-grade zones with underground mining potential.
Gold mineralization occurs in sheeted and stockwork quartz–sulphide veins within the Box
Athona Deposit – Near-Pit Resource Expansion Potential
Mineral resources at
Two initial drill holes (270 m) are planned with the dual purpose of testing mineralization continuity in the AWMG and testing an underlying extension of the AMG below the AWMG. This target is located directly adjacent to, and partially overlapping, the
Gold mineralization at
Exploration Drilling at Underexplored Historical Gold Occurrences
The Frontier,
Frontier – Located 800 metres northwest of the Box Deposit, the mineralized Frontier
Triangle – Triangle hosts a broad quartz-vein system that has returned surface grab samples up to 177 g/t gold from recent fieldwork. Unlike the granite-hosted targets at Box,
Two initial drill holes (200 metres) will be completed to properly evaluate the target and assess continuity of the mineralized system both along strike and down dip.
Technical Disclosure
Current Drilling and Sampling Results
The Box 2021 ("B21") and 2022 ("B22") drill holes were oriented at moderate dips (-55 to -60 degrees) to the east to intersect the dominant mineralized vein-sets at high angles, and true thicknesses are estimated to be approximately 80% of the intersected lengths. Drill results shown are assays from 1 metre samples of half-cut NQ core composited into longer intervals using a minimum lower cut-off of 0.5 g/t Au, and maximum 5 metres of consecutive waste defined as < 0.3 g/t Au.
Surface sample results from Triangle derive from grab samples collected by hand from outcrop. Grab samples are selective in nature and are not necessarily representative of the overall mineralization at the occurrence.
Historical Results
Historical exploration results for
Mineral Resource Estimate
The Mineral Resource Estimate for Box and
Qualified Person & Technical Disclosure
The technical and scientific information in this news release has been reviewed and approved by
About Goldfields
The 100% owned
About Fortune Bay
On behalf of
"Dale
Chief Executive Officer
902-334-1919
Cautionary Statement
Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management's current estimates, beliefs, intentions, and expectations. They are not guarantees of future performance. Words such as "expects", "aims", "anticipates", "targets", "goals", "projects", "intends", "plans", "believes", "seeks", "estimates", "continues", "may", variations of such words, and similar expressions and references to future periods, are intended to identify such forward-looking statements, and include, but are not limited to, statements with respect to: the results of the Updated PEA, including future Project opportunities, future operating and capital costs, closure costs, AISC, the projected NPV, IRR, timelines, permit timelines, and the ability to obtain the requisite permits, economics and associated returns of the Project, the technical viability of the Project, the market and future price of and demand for gold, the environmental impact of the Project, and the ongoing ability to work cooperatively with stakeholders, including Indigenous Nations, local Municipalities and local levels of government. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward- looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate Indigenous Nations and local Municipalities, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. For more information on Fortune Bay, readers should refer to Fortune Bay's website at www.fortunebaycorp.com.
Neither
SOURCE