Freegold Drills 1.28 g/t Au over 49.3m in New Tamarack Zone at Golden Summit and 0.91 g/t Au Over 150.9m at Cleary
Highlights:
-
New Zone at Tamarack 1.28 g/t Au over 49.3m – 400m to the east -
Cleary Zone 0 .91 g/t Au over 150.9m – zone broadening at depth
|
The width refers to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization |
The first hole in the
|
Hole |
Depth (m) |
Dip (°) |
Azimuth |
From (m) |
To (m) |
Interval |
Au (g/t) |
|
GS2536 |
483.3 |
-70 |
330 |
103.4 |
113.0 |
9.6 |
0.88 |
|
|
|
|
|
279.5 |
281.7 |
2.2 |
23.1 |
|
|
|
|
|
362.0 |
411.2 |
49.2 |
1.28 |
|
|
|
|
|
452.0 |
473.9 |
21.9 |
0.71 |
|
The width refers to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization |
|
|
|
Hole |
Depth (m) |
Dip (°) |
Azimuth (°) |
From (m) |
To (m) |
Interval |
Au (g/t) |
|
GS2532 |
785.5 |
-75 |
360 |
389.2 |
395.3 |
6.1 |
24.9 |
|
|
|
|
|
529.4 |
680.3 |
150.9 |
0.91 |
|
width refers to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization |
|
|
The easternmost drill hole in the Cleary Zone, GS2532, was directed north to assess the down-dip continuity of the Cleary Vein system along its eastern edge. Known for high-grade, narrow, and discontinuous veins at shallower depths,
Drilling was completed in mid-December, with 62 holes drilled. Analytical work, cutting and sampling of the remaining drill holes, is ongoing, and further results will be reported once they have been received and validated.
Drilling is planned to re-commence in February, beginning with an initial 50,000-meter program. Comprehensive metallurgical studies and an extensive infill drilling campaign will continue to support ongoing resource modelling and the pre-feasibility study ("PFS"). These efforts are underpinned by a highly successful equity financing round that attracted participation from over 20 institutions and secured capital for continued exploration beyond the main resource area and for completing the PFS.
About
Since 2020, the
As of
Links to the Plan Map and Section 479950E
https://freegoldventures.com/site/assets/files/6287/section-479950e.pdf
https://freegoldventures.com/site/assets/files/6287/nr-2025-drilling-20260113.pdf
HQ Core is logged, photographed and cut in half using a diamond saw, and one-half is placed in sealed bags for preparation and subsequent geochemical analysis by
Core samples were delivered to ALS's facility in
A QA/QC program includes laboratory and field standards inserted every ten samples. Blanks are inserted at the start of the submittal, and at least one blank every 25 standards.
The Qualified Person for this release is
About
Some statements in this news release contain forward-looking information, including, without limitation, statements as to planned expenditures and exploration programs, potential mineralization and resources, exploration results, the completion of an updated NI 43-101 technical report, and any other future plans. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance, or achievements expressed or implied by the statements. Such factors include, without limitation, the completion of planned expenditures, the ability to complete exploration programs on schedule, and the success of exploration programs. See
SOURCE