P2 Gold Announces Infill and Expansion Drill Results from Gabbs
"We are pleased with the results of drilling initially planned for
Drilling Highlights
Select drill results (see Table 1 below for drill results) from holes GBR-067 to GBR-073 drilled at the
- Hole GBR-068 intersected 0.43 g/t gold and 0.19% copper over 71.63 meters from 25.91 meters downhole and also intersected 0.25 g/t gold and 0.20% copper over 38.10 meters starting 97.54 meters downhole;
- Hole GBR-069 intersected 0.55 g/t gold and 0.34% copper over 60.96 meters starting 28.96 meters downhole, including 12.19 meters grading 1.25 g/t gold and 0.46% copper starting 35.05 meters downhole and also intersected 0.11 g/t gold and 0.18% copper over 33.53 meters starting 89.92 meters downhole;
- Hole GBR-073 intersected 0.41 g/t gold and 0.23% copper over 70.10 meters from 74.68 meters downhole, including 13.72 meters grading 0.71 g/t gold and 0.25% copper starting 83.82 meters downhole.
The main body of
Since the start of the Program in
On completion of the Infill and Expansion Drill Program, an updated Mineral Resource estimate will be prepared for Gabbs, which is expected to be completed in mid-2026. The updated Mineral Resource estimate will form the basis of a feasibility study on placing Gabbs in production, which is expected to be completed in the fourth quarter of 2026.
Plan maps and sections for drill holes GBR-067 to 073 of the Gabbs Expansion and Infill Drill Program are available here.
Table 1: Selected Gabbs Drill Results,
|
|
Collar Coords |
Dip/ |
From |
To |
Interval |
Gold |
Copper |
|
GBR-067 |
N4292711/ |
-90/0 |
92.96 |
155.45 |
62.48 |
0.31 |
0.22 |
|
|
|
FM |
155.45 |
192.02 |
36.58 |
0.15 |
0.23 |
|
GBR-068 |
N4292783/ |
-90/0 |
25.91 |
97.54 |
71.63 |
0.43 |
0.19 |
|
|
|
FM |
97.54 |
135.64 |
38.10 |
0.25 |
0.20 |
|
GBR-069 |
N4292781/ |
-50/45 |
28.96 |
89.92 |
60.96 |
0.55 |
0.34 |
|
|
|
Incl |
35.05 |
47.24 |
12.19 |
1.25 |
0.46 |
|
|
|
FM |
89.92 |
123.44 |
33.53 |
0.11 |
0.18 |
|
GBR-070 |
N4292868/ |
-50/45 |
10.67 |
41.15 |
30.48 |
0.38 |
0.23 |
|
|
|
FM |
41.15 |
76.20 |
35.05 |
0.12 |
0.22 |
|
GBR-071 |
N4292863/ |
-50/225 |
6.10 |
38.10 |
32.00 |
0.23 |
0.23 |
|
|
|
FM |
38.10 |
96.01 |
57.91 |
0.10 |
0.18 |
|
GBR-072 |
N4292921/ |
-90/0 |
4.57 |
41.15 |
36.58 |
0.31 |
0.26 |
|
|
|
FM |
41.15 |
77.72 |
36.58 |
0.15 |
0.19 |
|
GBR-073 |
N4292660/ |
-90/0 |
74.68 |
144.78 |
70.10 |
0.41 |
0.23 |
|
|
|
incl |
83.82 |
97.54 |
13.72 |
0.71 |
0.25 |
|
(1) |
True thickness to be determined. |
|
(2) |
All samples were submitted for preparation by ALS Global at its facilities in |
|
(3) |
NSV means no significant values; FM means footwall mineralization. |
Qualified Person
About
Neither the
Forward Looking Information
This press release contains "forward-looking information" within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking information" includes statements that use forward-looking terminology such as "may", "will", "expect", "anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or comparable terminology. Such forward-looking information includes, without limitation, information with respect to the Company's expectations, strategies and plans for the
Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made as well as the other assumptions disclosed in this news release. Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking information and risks associated with mineral exploration, including the risk that actual results and timing of exploration and development will be different from those expected by management. See "Risk Factors" in the Company's annual information form for the year ended
The Company cautions that there can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, investors should not place undue reliance on forward-looking information.
Except as required by law, the Company does not assume any obligation to release publicly any revisions to forward-looking information contained in this press release to reflect events or circumstances after the date hereof.
SOURCE